Brazil's WEG shortens test time by 50% with ABI's MIS4
NOVEMBER 2016
WEG, a leading electric engineering, power and automation technology manufacturer reported gains of 50% in PCB assembly testing time following the implementation of ABI's MIS 4 module in Brazil.
The globally known manufacturer of electric motors, generators, transformers and drives with operations in around 100 countries, completed the implementation of ABI's SYSTEM MIS 4 for the final production test of complex controller cards used in the company's popular variable speed drives.
#ABISavesYouTime / #Repairdontwaste
Share this:
Tweet